Final | 2/24/2012 | 2/27/2012 | 2/27/2012 | P | PASS |
Daryl DeGrange
|
|
|
Toby Phone #: ###-#### >> Inspection requested via web by Sean DeLacy final ok
|
Electrical Rough-In | 2/23/2012 | 2/24/2012 | 2/24/2012 | A | PART |
Jack Frank
|
|
|
ceiling cover//Toby Phone #: ###-#### RME ceiling ok ----- low voltage contractor ceiling r/i failed correction posted on BLD11-02870 NEC 800.21&24, 300.11 support all low voltage cables above ceiling grid per codes noted . I explained this to the contractor 2 times now, once on 02-23-12, and today
|
Electrical Rough-In | 2/21/2012 | 2/23/2012 | 2/23/2012 | P | FAIL |
Jack Frank
|
|
|
Dave. Ceiling cover. Phone #: ###-#### >> Inspection requested via web by Sean DeLacy ID cable support wires, shall not use fixture support wires for required support wires 300.11, note all low voltage cables shall be support off of grid , and shall not use ceiling support wires to support them if ? call Jack
|
Permanent Service | 2/10/2012 | 2/13/2012 | 2/13/2012 | A | PASS |
Jack Frank
|
|
|
DAVE Phone #: ###-#### >> Inspection requested via web by Sean DeLacy p/s u/g new ok
|
Electrical Rough-In | 1/19/2012 | 1/20/2012 | 1/20/2012 | A | PASS |
Bob Reichert
|
|
|
Toby wall cover Phone #: ###-#### >> Inspection requested via web by Sean DeLacy walls only ok cover
|