Final | 3/29/2012 | 3/30/2012 | 3/30/2012 | A | PASS |
Bob Reichert
|
|
|
requsting final inspection of electrical work for the bulk ammonia system. Phone #: ###-#### >> Inspection requested via web by Steve Moss ok final
|
Electrical Rough-In | 2/8/2012 | 2/9/2012 | 2/9/2012 | P | PASS |
Bob Reichert
|
|
|
Look at underground PVC, and ground grid at bulk NH3 project. Phone #: ###-#### >> Inspection requested via web by Steve Moss ok cover u/g
|
Electrical Rough-In | 1/30/2012 | 1/31/2012 | 1/31/2012 | A | PASS |
Bob Reichert
|
|
|
look at cadwelds in coulmn bases before pouring concrete. Steve Moss Phone #: ###-#### >> Inspection requested via web by Steve Moss columns ok to pour
|