Final | 9/30/2014 | 10/1/2014 | 10/1/2014 | A | PASS |
Daryl DeGrange
|
|
|
Dan// as early as possible please Phone #: ###-#### correction done, final ok
|
Final | 9/29/2014 | 9/29/2014 | 9/29/2014 | P | FAIL |
Rex Boyles
|
|
|
Dan Phone #: ###-#### 210.8 (A)(7) GFCI protection required within 6 foot of sink
|
Electrical Rough-In | 9/8/2014 | 9/9/2014 | 9/9/2014 | A | PASS |
Rex Boyles
|
|
|
Dan Phone #: ###-#### r/i floorheat ok in bsmt. bath
|
ELE-Aging Inspection | 6/23/2014 | 6/23/2014 | 6/24/2014 | | DONE |
Rex Boyles
|
|
|
too busy
|
ELE-Aging Inspection | 3/24/2014 | 3/24/2014 | 3/24/2014 | | DONE |
Rex Boyles
|
|
|
left message
|
Electrical Rough-In | 12/23/2013 | 12/23/2013 | 12/23/2013 | P | PASS |
Rock A. Hudson
|
|
|
PLease call prior to insepction-Dan Phone #: ###-#### Basement bath, utility, mechanical rough in ok cover
|
ELE-Aging Inspection | 12/5/2013 | 12/5/2013 | 12/9/2013 | | CANC |
Rock A. Hudson
|
|
|
too busy
|
Conference | 9/5/2013 | 9/6/2013 | 9/6/2013 | A | PASS |
Rock A. Hudson
|
|
|
Dan Phone #: ###-#### Discussed GFCI protection, required dedicated circuits, and arc fault protection.
|
ELE-Aging Inspection | 6/7/2013 | 6/7/2013 | 6/7/2013 | | DONE |
Rock A. Hudson
|
|
|
still under construction
|
ELE-Aging Inspection | 3/8/2013 | 3/8/2013 | 3/8/2013 | | DONE |
Rock A. Hudson
|
|
|
still under construction
|
ELE-Request for Extension | 7/27/2012 | 7/30/2012 | 7/30/2012 | A | PASS |
Daryl DeGrange
|
|
|
or ###-#### Dan Rothenbuhler Phone #: ###-####
|