Final | 4/5/2013 | 4/5/2013 | 4/5/2013 | P | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### >> Inspection requested via web by Kerri Hamilton Single phase service to be removed when new 3 phase service is installed and energized. Final ok
|
Electrical Rough-In | 4/4/2013 | 4/5/2013 | 4/5/2013 | A | CANC |
Bob Reichert
|
|
|
Phone #: ###-#### >> Inspection requested via web by Alan Lusk see ri
|
ELE-Aging Inspection | 3/21/2013 | 3/21/2013 | 3/25/2013 | | DONE |
Rock A. Hudson
|
|
|
Called contractor left message
|
Permanent Service | 3/21/2012 | 3/22/2012 | 3/22/2012 | A | PASS |
Daryl DeGrange
|
|
|
Darryl is the contact. Please call 1/2 hour before as the building is locked. Thank you Phone #: ###-#### >> Inspection requested via web by Patrick D Gill p/s o/h rec ok meter pac
|
Conference | 2/16/2012 | 2/17/2012 | 2/17/2012 | A | DONE |
Bob Reichert
|
|
|
Please call a half hour in advance if possible as we need to make sure its unlocked. Thank you Patrick Phone #: ###-#### >> Inspection requested via web by Patrick D Gill talked about one service only for building
|