Rough-In Permanent Service | 3/22/2012 | 3/23/2012 | 3/23/2012 | A | PASS |
Jack Frank
|
|
|
Per the inspector "Jack" this Rough-In also serves as the Final. Jack already met up with our Energy Industries Electrician Roy Trees on 3/20/12. Please call Davene at ###-#### X306 if any further steps are required. Thank you >> Inspection requested via web by Davene Grant
|
Final | 3/23/2012 | 3/23/2012 | 3/23/2012 | A | PASS |
Jack Frank
|
|
|
Per the inspector "Jack" this Rough-In also serves as the Final. Jack already met up with our Energy Industries Electrician Roy Trees on 3/20/12. Please call Davene at ###-#### X306 if any further steps are required. Thank you >> Inspection requested via web by Davene Grant
|
Final | 3/19/2012 | 3/20/2012 | 3/20/2012 | P | NR |
Jack Frank
|
|
|
Please connect with Matt the store manager so he can be available. Phone #: ###-#### >> Inspection requested via web by Davene Grant called left message for Roy Trees
|