Final | 3/20/2012 | 3/20/2012 | 3/20/2012 | P | PASS |
Doug A Poedy
|
|
|
Equipment supplied with electrical energy shall be listed and labeled. After inspection noted that all parts of cooler with electrical energy supplied are listed. Components( as in cooler panels) with no electrical energy are not. As AHJ, I approve this assembly as being safe for operation as per NEC 110.2 and 110.3A
|
Final | 3/19/2012 | 3/20/2012 | 3/20/2012 | P | PART |
Jack Frank
|
|
|
Phone #: ###-#### >> Inspection requested via web by Stan Woodward correction posted for cooler/freezer not listed or labeled temp occupancy ok
|
Electrical Rough-In | 3/14/2012 | 3/15/2012 | 3/15/2012 | P | PASS |
Jack Frank
|
|
|
Rough in Cover ceiling Phone #: ###-#### >> Inspection requested via web by Stan Woodward ok needs show window recepts, no listing for cooler/freezer
|
Electrical Rough-In | 2/29/2012 | 3/1/2012 | 3/1/2012 | A | PASS |
Jack Frank
|
|
|
For cover for walls Phone #: ###-#### >> Inspection requested via web by Stan Woodward ok
|
Electrical Rough-In | 2/24/2012 | 2/24/2012 | 2/24/2012 | P | PASS |
Jack Frank
|
|
|
Underground Phone #: ###-#### >> Inspection requested via web by Stan Woodward ok
|