Final | 3/15/2012 | 3/16/2012 | 3/16/2012 | A | PASS |
Bob Reichert
|
|
|
ryan Phone #: ###-#### ok final
|
Final | 3/13/2012 | 3/13/2012 | 3/13/2012 | P | FAIL |
Bob Reichert
|
|
|
Ryan Phone #: ###-#### called, shall provide metal cover for j-box, fix open ground in receptacle, wire in furnace
|
Electrical Rough-In | 3/2/2012 | 3/2/2012 | 3/2/2012 | P | NR |
Jack Frank
|
|
|
Ryan Phone #: ###-#### jbox ok no splicing not done , also needs to grd or bond water system from new p/s not jbox and shall use #4 copper see 250.52(A)(1), for GEC or 250.104(A)(1) if bonding water pipes sized to table 250.66
|
Rough-In Permanent Service | 2/27/2012 | 2/27/2012 | 2/27/2012 | P | PASS |
Bob Reichert
|
|
|
ryan Phone #: ###-#### ri ok except at j-box, p/s o/h rec ok
|