Final | 5/8/2012 | 5/8/2012 | 5/8/2012 | P | PASS |
Daryl DeGrange
|
|
|
Phone #: ###-#### >> Inspection requested via web by daniel bibikov final ok
|
Final | 5/7/2012 | 5/7/2012 | 5/8/2012 | P | FAIL |
Bob Reichert
|
|
|
Phone #: ###-#### >> Inspection requested via web by daniel bibikov contractor not done, shall strap riser, tighten garage outlets, provide 6'-12' outlet space, install outlet upper deck, rest ok
|
Rough-In Permanent Service | 3/6/2012 | 3/6/2012 | 3/7/2012 | P | PASS |
Bob Reichert
|
|
|
Phone #: ###-#### >> Inspection requested via web by daniel bibikov corrections made according to contractor, builder started insulating, so can not see all for NEC 300.4, told contractor that he will be responsible, and next time covers without ok will result in stop work order, p/s u/g n ok
|
Rough-In Permanent Service | 2/26/2012 | 2/27/2012 | 2/27/2012 | A | FAIL |
Bob Reichert
|
|
|
Phone #: ###-#### >> Inspection requested via web by daniel bibikov called, left correction notice, NEC 300.4(A) edge of bored holes shall be 1 1/4" from edge of framing members, 334.23 shall protect cables within 6' of attic access, 210.52 (H) shall provide receptacle in upper hall, BCC shall terminate nm cable in boxes in down bath
|