Permanent Service | 3/21/2012 | 3/22/2012 | 3/22/2012 | P | PASS |
Bob Reichert
|
|
|
Phone #: ###-#### >> Inspection requested via web by Lars Johnson corrections made, ok cover trench, p/s u/g n ok
|
Final | 3/22/2012 | 3/22/2012 | 3/22/2012 | P | PASS |
Bob Reichert
|
|
|
Phone #: ###-#### >> Inspection requested via web by Lars Johnson ok final
|
Final | 3/16/2012 | 3/19/2012 | 3/19/2012 | A | FAIL |
Bob Reichert
|
|
|
Phone #: ###-#### >> Inspection requested via web by Lars Johnson called, left correction notice, 250.64(C) grounding electrode conductor shall be installed in continuous length without splice or joint, 110.22(A) disconnect marking shall be of sufficient durability to withstand environment involved, 110.26 shall provide work space about equipment- 36" deep and 30" width, fee due
|
Final | 3/15/2012 | 3/16/2012 | 3/16/2012 | A | FAIL |
Bob Reichert
|
|
|
- (2) new 50A pedestals (space 41&43) - (1) new 100A main panel (space 41) - (1) new 100A overhead feed from existing meter main in space 37 Phone #: ###-#### >> Inspection requested via web by Lars Johnson called, shall call for p/s, NEC 300.5 top of conduit shall be 18" below surface, 110.26 shall provide free and clear work space in front of panel, 250.56 shall provide 2 ground rods at each service, 110.22 shall label disconnects
|