Final | 10/10/2013 | 10/11/2013 | 10/11/2013 | A | PASS |
Bob Reichert
|
|
|
###-#### call first please ok final
|
ELE-Aging Inspection | 10/1/2013 | 10/1/2013 | 10/2/2013 | | CANC |
Bob Reichert
|
|
|
|
ELE-Aging Inspection | 7/2/2013 | 7/2/2013 | 7/8/2013 | | DONE |
Bob Reichert
|
|
|
called, still under construction
|
Electrical Rough-In | 4/19/2012 | 4/20/2012 | 4/20/2012 | P | PASS |
Bob Reichert
|
|
|
Roughed in condo #302 Phone #: ###-#### >> Inspection requested via web by nathan palmer ri ok
|
Electrical Rough-In | 4/18/2012 | 4/18/2012 | 4/18/2012 | P | CANC |
Bob Reichert
|
|
|
Relocated panel, rearranged circuits. neead approval to cover. Condo # is 302. Phone #: ###-#### >> Inspection requested via web by nathan palmer see conference
|
Conference | 4/18/2012 | 4/18/2012 | 4/18/2012 | P | DONE |
Bob Reichert
|
|
|
Relocated panel, rearranged circuits. neead approval to cover. Condo # is 302. Phone #: ###-#### >> Inspection requested via web by nathan palmer talked about remodel for unit, panel space, drip protection, can lighting, receptacle locations
|
Electrical Rough-In | 4/18/2012 | 4/18/2012 | 4/18/2012 | A | CANC |
Bob Reichert
|
|
|
Rough-in inspection, approve to cover. Relocated panel and rearranged circuits. Condo # 302 Phone #: ###-#### >> Inspection requested via web by nathan palmer Inspection cancelled from web by: nathan palmer
|
Electrical Rough-In | 4/16/2012 | 4/16/2012 | 4/16/2012 | P | CANC |
Bob Reichert
|
|
|
Inspect for approval to cover. Rough-in currently not complete so Monday PM inspection only. (Or I needs to be rescheduled for Tuesday.) Please call before heading to inspection! Phone #: ###-#### >> Inspection requested via web by nathan palmer called, not ready, will reschedule
|