Permanent Service | 6/1/2012 | 6/1/2012 | 6/1/2012 | P | PASS |
Jack Frank
|
|
|
Phone #: ###-#### - call 30 mins prior note p/s is a outside feeder from house service
|
Final | 6/1/2012 | 6/1/2012 | 6/1/2012 | P | PASS |
Jack Frank
|
|
|
Phone #: ###-#### - call 30 mins prior final p/s for playhouse wired under a Meridian ele permit ok
|
Permanent Service | 4/11/2012 | 4/12/2012 | 4/12/2012 | P | PASS |
Jack Frank
|
|
|
mucho Phone #: ###-#### p/s o/h rec. ok
|
Permanent Service | 4/12/2012 | 4/12/2012 | 4/12/2012 | P | NR |
Jack Frank
|
|
|
mucho Phone #: ###-#### stopped by job to check status called grding not done mast not high enough panel not set, still needs 2 grd rods, told contractor when ready
|