Final | 1/22/2014 | 1/23/2014 | 1/23/2014 | A | PASS |
Daryl DeGrange
|
|
|
Phone #: ###-#### >> Inspection requested via web by Lori Stout job complete, final ok
|
ELE-Aging Inspection | 1/14/2014 | 1/14/2014 | 1/14/2014 | | DONE |
Daryl DeGrange
|
|
|
still under construction, contractor said. will call for final soon
|
ELE-Aging Inspection | 10/15/2013 | 10/15/2013 | 10/15/2013 | | DONE |
Daryl DeGrange
|
|
|
still under construction
|
ELE-Aging Inspection | 7/16/2013 | 7/16/2013 | 7/16/2013 | | DONE |
Daryl DeGrange
|
|
|
close but still under construction
|
Electrical Rough-In | 9/10/2012 | 9/11/2012 | 9/11/2012 | A | PART |
Doug A Poedy
|
|
|
Please call before going ###-#### rough underground Thank you Phone #: ###-#### >> Inspection requested via web by Lori Stout
|
Electrical Rough-In | 7/31/2012 | 7/31/2012 | 7/31/2012 | P | PASS |
Doug A Poedy
|
|
|
Elliott is ready to have the conduits in the UV channel walls inspected. Phone #: ###-#### >> Inspection requested via web by Mike TenHulzen
|
Electrical Rough-In | 7/18/2012 | 7/18/2012 | 7/18/2012 | P | PART |
Doug A Poedy
|
|
|
LOOK AT CONDUITS TO BE POURED IN SLAB AND MEET TO GO OVER PROJECT. ELLIOTT IS THE CONTACT ###-####. Phone #: ###-#### >> Inspection requested via web by Mike TenHulzen.UV room floor conduit ok to cover.
|