Final | 8/28/2012 | 8/29/2012 | 8/29/2012 | A | PASS |
Bob Reichert
|
|
|
Phone #: ###-#### >> Inspection requested via web by Therrin Robertson ok final, signed card
|
Final | 8/28/2012 | 8/29/2012 | 8/28/2012 | A | CANC |
Jack Frank
|
|
|
Phone #: ###-#### >> Inspection requested via web by Therrin Robertson Inspection cancelled from web by: Therrin Robertson
|
Final | 8/27/2012 | 8/27/2012 | 8/27/2012 | A | FAIL |
Bob Reichert
|
|
|
see request for 8/24/12 fail
|
Final | 8/24/2012 | 8/24/2012 | 8/27/2012 | P | FAIL |
Bob Reichert
|
|
|
Phone #: ###-#### >> Inspection requested via web by Therrin Robertson met contractor, shall finish panel schedules, replace breakers, label panels, close open ko spaces in panels, fix dead outlet, support boxes, add showroom receptacles, close open boxes
|
Electrical Rough-In | 5/10/2012 | 5/10/2012 | 5/10/2012 | P | PASS |
Jack Frank
|
|
|
Phone #: ###-#### >> Inspection requested via web by Therrin Robertson walls
|
Electrical Rough-In | 5/9/2012 | 5/9/2012 | 5/9/2012 | P | CANC |
Bob Reichert
|
|
|
Phone #: ###-#### >> Inspection requested via web by Therrin Robertson called and asked to call for am, gave permission to one side walls
|
Electrical Rough-In | 5/2/2012 | 5/3/2012 | 5/3/2012 | A | PASS |
Jack Frank
|
|
|
Phone #: ###-#### >> Inspection requested via web by Therrin Robertson u/g ok
|