Final | 6/29/2012 | 7/3/2012 | 7/3/2012 | A | PASS |
Daryl DeGrange
|
|
|
dave Phone #: ###-#### final ok
|
Final | 6/26/2012 | 6/27/2012 | 6/27/2012 | P | PASS |
Daryl DeGrange
|
|
|
For Ceiling cover ONLY. Not a final inspection. Dave Kubik is the on-site contact. Phone #: ###-#### >> Inspection requested via web by Chad McKibben rough-in ok cover ceiling grid
|
Electrical Rough-In | 5/18/2012 | 5/21/2012 | 5/21/2012 | A | PASS |
Daryl DeGrange
|
|
|
Contact is Dave. Inspection for conduit that is to be burried. Phone #: ###-#### >> Inspection requested via web by Chad McKibben rough-in ok inside undergroung
|
Electrical Rough-In | 5/15/2012 | 5/16/2012 | 5/16/2012 | A | PASS |
Bob Reichert
|
|
|
Phone #: ###-#### >> Inspection requested via web by Chad McKibben walls only ok, outside u/g ok, will call back for inside u/g
|