ELE-Aging Inspection | 6/13/2014 | 6/13/2014 | 6/16/2014 | | DONE |
Daryl DeGrange
|
|
|
see final
|
Final | 6/16/2014 | 6/16/2014 | 6/16/2014 | P | PASS |
Daryl DeGrange
|
|
|
job complete, final ok
|
ELE-Aging Inspection | 3/14/2014 | 3/14/2014 | 3/14/2014 | | DONE |
Daryl DeGrange
|
|
|
Did make contact with contractor, who agreed to check out job and call for final when ready.
|
ELE-Aging Inspection | 12/12/2013 | 12/12/2013 | 12/13/2013 | | DONE |
Daryl DeGrange
|
|
|
Left message on contractors phone about final inspection required
|
ELE-Aging Inspection | 9/12/2013 | 9/12/2013 | 9/12/2013 | | DONE |
Daryl DeGrange
|
|
|
contractor will call for final
|
Electrical Rough-In | 5/17/2012 | 5/17/2012 | 5/17/2012 | P | PASS |
Jack Frank
|
|
|
Michael Phone #: ###-#### ok
|