Final | 6/22/2012 | 6/25/2012 | 6/25/2012 | P | PASS |
Daryl DeGrange
|
|
|
Phone #: ###-#### >> Inspection requested via web by Kendra Lanham final ok
|
Final | 6/22/2012 | 6/22/2012 | 6/22/2012 | P | PART |
Daryl DeGrange
|
|
|
partial final south half building
|
Final | 6/7/2012 | 6/7/2012 | 6/7/2012 | P | PART |
Daryl DeGrange
|
|
|
Phone #: ###-#### >> Inspection requested via web by Kendra Lanham Northend half of TI partial final ok
|
Electrical Rough-In | 5/21/2012 | 5/21/2012 | 5/21/2012 | P | PASS |
Daryl DeGrange
|
|
|
Please look at walls for cover. Ceiling, conduit and lights are existing. Phone #: ###-#### >> Inspection requested via web by Kendra Lanham rough-in ok cover walls
|