Final | 8/13/2012 | 8/14/2012 | 8/14/2012 | A | PASS |
Daryl DeGrange
|
|
|
Need job final and grid ceiling inspection. Phone #: ###-#### >> Inspection requested via web by Alan Lusk final ok
|
Electrical Rough-In | 8/14/2012 | 8/14/2012 | 8/14/2012 | A | PASS |
Daryl DeGrange
|
|
|
rough-in ok cover ceiling grid
|
Electrical Rough-In | 8/9/2012 | 8/10/2012 | 8/10/2012 | A | FAIL |
Bob Reichert
|
|
|
Grid ceiling inspection Phone #: ###-#### >> Inspection requested via web by Alan Lusk called, BCC no violations shall be retained, shall remove low voltage wiring and the tiles and grid shall not support wiring
|
Electrical Rough-In | 7/2/2012 | 7/9/2012 | 7/9/2012 | A | PASS |
Jack Frank
|
|
|
Please do inspection after 8:00am but before noon. Phone #: ###-#### >> Inspection requested via web by Alan Lusk walls ok
|
Electrical Rough-In | 6/5/2012 | 6/5/2012 | 6/5/2012 | P | PASS |
Jack Frank
|
|
|
Alan Phone #: ###-#### u/g conduit and floor boxes ok
|