Final | 10/3/2012 | 10/3/2012 | 10/3/2012 | P | PASS |
Daryl DeGrange
|
|
|
Storage locker#7 has a lock box access code 7778,to access units#2,3,10&12 Phone #: ###-#### >> Inspection requested via web by George Lloyd Unit # 11 only final ok
|
Electrical Rough-In | 8/8/2012 | 8/8/2012 | 8/8/2012 | A | PASS |
Doug A Poedy
|
|
|
Has bathroom remodel on units 10&12 Phone #: ###-#### >> Inspection requested via web by George Lloyd.Ok to cover bathroom.
|
Electrical Rough-In | 8/7/2012 | 8/7/2012 | 8/7/2012 | P | FAIL |
Bob Reichert
|
|
|
Phone #: ###-#### >> Inspection requested via web by George Lloyd called, shall provide strapping, deadfronts, grounding, abrasion protection, work space about electrical equipment
|
Permanent Service | 6/5/2012 | 6/5/2012 | 6/5/2012 | P | FAIL |
Jack Frank
|
|
|
Reconnection of previously existing service Phone #: ###-#### >> Inspection requested via web by George Lloyd called 2 p/s per blding, shall meet all NEC requirements grding, clearence
|