Final | 6/27/2012 | 6/27/2012 | 6/27/2012 | P | PASS |
Bob Reichert
|
|
|
Phone #: ###-#### >> Inspection requested via web by Therrin Robertson ok final, signed card
|
Electrical Rough-In | 6/27/2012 | 6/27/2012 | 6/27/2012 | P | PASS |
Bob Reichert
|
|
|
Phone #: ###-#### >> Inspection requested via web by Therrin Robertson ok cover ceiling
|
Final | 6/26/2012 | 6/26/2012 | 6/26/2012 | A | FAIL |
Bob Reichert
|
|
|
Phone #: ###-#### >> Inspection requested via web by Therrin Robertson called, shall call for ri after fixtures installed
|
Electrical Rough-In | 6/13/2012 | 6/13/2012 | 6/13/2012 | P | PASS |
Bob Reichert
|
|
|
Phone #: ###-#### >> Inspection requested via web by Therrin Robertson corrections made, ri ok
|
Electrical Rough-In | 6/12/2012 | 6/12/2012 | 6/12/2012 | P | FAIL |
Bob Reichert
|
|
|
Rough wiring on added office Phone #: ###-#### >> Inspection requested via web by Therrin Robertson called, left correction notice, NEC 330(B) shall secure mc cable within 12" of boxes, BCC shall not run mv in valley of steel studs, shall provide mud rings
|