Final | 9/28/2012 | 10/1/2012 | 10/1/2012 | A | PASS |
Daryl DeGrange
|
|
|
Duane O''Reilly ###-#### Phone #: ###-#### >> Inspection requested via web by Debby Ellis final ok
|
Electrical Rough-In | 6/21/2012 | 6/21/2012 | 6/22/2012 | P | PASS |
Doug A Poedy
|
|
|
Greg Critchfield ###-#### is contact. thanks Phone #: ###-#### >> Inspection requested via web by Debby Ellis. Underground ok.
|
Conference | 6/18/2012 | 6/18/2012 | 6/18/2012 | P | DONE |
Jack Frank
|
|
|
PLEASE call Terry Cushing before hand, to meet there. ###-####. thank you. Phone #: ###-#### >> Inspection requested via web by Debby Ellis
|
Electrical Rough-In | 6/18/2012 | 6/18/2012 | 6/18/2012 | P | PASS |
Jack Frank
|
|
|
PLEASE call Terry Cushing before hand, to meet there. ###-####. thank you. Phone #: ###-#### >> Inspection requested via web by Debby Ellis u/g in flowerbed by building
|