Final | 6/16/2014 | 6/16/2014 | 6/16/2014 | P | PASS |
Rex Boyles
|
|
|
Debbie Phone #: ###-#### final ok
|
Final | 6/11/2014 | 6/12/2014 | 6/12/2014 | A | NH |
Rex Boyles
|
|
|
debbie Phone #: ###-#### no answer door or phone
|
ELE-Aging Inspection | 4/17/2014 | 4/17/2014 | 4/18/2014 | | DONE |
Rex Boyles
|
|
|
finaled on 1/14/14 by Rock H
|
ELE-Aging Inspection | 1/16/2014 | 1/16/2014 | 1/17/2014 | | DONE |
Rock A. Hudson
|
|
|
Still under construction
|
Conference | 9/10/2012 | 9/10/2012 | 9/10/2012 | P | DONE |
Daryl DeGrange
|
|
|
Phone #: ###-#### >> Inspection requested via web by Therrin Robertson Discussed clearances from pool and pool structures of overhead power lines NEC 680.8
|
Rough-In Permanent Service | 6/25/2012 | 6/25/2012 | 6/25/2012 | P | PASS |
Daryl DeGrange
|
|
|
Phone #: ###-#### >> Inspection requested via web by Therrin Robertson rough-in p/s o/h rec ok
|