Final | 9/11/2012 | 9/11/2012 | 9/11/2012 | P | PASS |
Doug A Poedy
|
|
|
Phone #: ###-#### >> Inspection requested via web by Mark M listed medical equipment final ok
|
Electrical Rough-In | 8/24/2012 | 8/24/2012 | 8/24/2012 | A | PASS |
Daryl DeGrange
|
|
|
Phone #: ###-#### >> Inspection requested via web by Mark M rough-in ok cover ceiling grid
|
Electrical Rough-In | 7/31/2012 | 8/1/2012 | 8/1/2012 | A | PASS |
Daryl DeGrange
|
|
|
cell ###-#### Phone #: ###-#### >> Inspection requested via web by Mark M rough-in ok cover floral 4 (basement)
|