Final | 7/31/2012 | 8/1/2012 | 8/1/2012 | A | PASS |
Daryl DeGrange
|
|
|
Please Provide a final inspection for the McReynolds TI. Call Cody with questions ###-####. Have a wonderful day!!!! Phone #: ###-#### >> Inspection requested via web by Kevin Perez final ok
|
Electrical Rough-In | 7/12/2012 | 7/13/2012 | 7/13/2012 | A | PASS |
Daryl DeGrange
|
|
|
Ceiling inspection on 6th floor. Contact Cody Smith ###-#### if any questions. Phone #: ###-#### >> Inspection requested via web by Kevin Perez rough-in ok cover ceiling grid
|
Electrical Rough-In | 7/6/2012 | 7/9/2012 | 7/9/2012 | A | PASS |
Daryl DeGrange
|
|
|
Cody is ready for a rough-in inspection in the walls. He will be on the 6th Floor of the US Bank Plaza. Give him a call ###-####. Have a great day! Phone #: ###-#### >> Inspection requested via web by Kevin Perez rough-in ok cover walls
|