Final | 9/17/2012 | 9/18/2012 | 9/17/2012 | A | PASS |
Daryl DeGrange
|
|
|
Ryan is on site Phone #: ###-#### >> Inspection requested via web by Buster Bowen final ok
|
Final | 9/17/2012 | 9/17/2012 | 9/17/2012 | A | NR |
Daryl DeGrange
|
|
|
Ryan is on site. Phone #: ###-#### >> Inspection requested via web by Buster Bowen
|
Electrical Rough-In | 8/29/2012 | 8/29/2012 | 8/29/2012 | A | PASS |
Daryl DeGrange
|
|
|
Ryan. Ceiling cover. Phone #: ###-#### >> Inspection requested via web by Sean DeLacy rough-in ok cover ceiling grid
|
Electrical Rough-In | 7/30/2012 | 7/31/2012 | 7/31/2012 | A | PASS |
Daryl DeGrange
|
|
|
RYAN. WALL COVER. Phone #: ###-#### >> Inspection requested via web by Sean DeLacy rough-in ok cover walls
|