Final | 11/28/2012 | 11/29/2012 | 11/29/2012 | A | PASS |
Bob Reichert
|
|
|
Dave Baugh on site. Phone #: ###-#### >> Inspection requested via web by Clint Tate corrections made, ok final, signed card
|
Final | 11/28/2012 | 11/28/2012 | 11/28/2012 | P | PART |
Bob Reichert
|
|
|
Dave Baugh on site. Phone #: ###-#### >> Inspection requested via web by Clint Tate met contractor, signed t/o card, shall securely strap flex raceway within 12" of termination, shall label disconnects, shall enclose conductor in raceway for fixtures
|
Electrical Rough-In | 10/1/2012 | 10/1/2012 | 10/1/2012 | P | PASS |
Bob Reichert
|
|
|
Dave Baugh is on site. Phone #: ###-#### >> Inspection requested via web by Clint Tate ri ok
|
Electrical Rough-In | 10/1/2012 | 10/1/2012 | 10/1/2012 | A | NR |
Bob Reichert
|
|
|
Dave Baugh is on site. Phone #: ###-#### >> Inspection requested via web by Clint Tate met contractor, still getting parts for job
|
Electrical Rough-In | 9/25/2012 | 9/26/2012 | 9/26/2012 | A | PART |
Doug A Poedy
|
|
|
Phone #: ###-#### >> Inspection requested via web by Clint Tate. Underground
|
Permanent Service | 9/21/2012 | 9/24/2012 | 9/24/2012 | A | PASS |
Bob Reichert
|
|
|
Phone #: ###-#### >> Inspection requested via web by Clint Tate met contractor, ok after switch over
|
Conference | 9/17/2012 | 9/18/2012 | 9/18/2012 | A | DONE |
Bob Reichert
|
|
|
Please call 30 minutes in advance so we can meet you there. Phone #: ###-#### >> Inspection requested via web by Clint Tate talked about service, see p/s
|
Permanent Service | 9/18/2012 | 9/18/2012 | 9/18/2012 | A | PASS |
Bob Reichert
|
|
|
Please call 30 minutes in advance so we can meet you there. Phone #: ###-#### >> Inspection requested via web by Clint Tate p/s u/g rec ok
|
Electrical Rough-In | 9/13/2012 | 9/13/2012 | 9/13/2012 | P | PASS |
Bob Reichert
|
|
|
Underground Phone #: ###-#### >> Inspection requested via web by Clint Tate u/g ok cover incoming to service
|
Electrical Rough-In | 8/17/2012 | 8/17/2012 | 8/17/2012 | P | PASS |
Daryl DeGrange
|
|
|
Ufer Ground Inspection
Wireman on site is Dave Baugh His number is ###-#### Phone #: ###-#### >> Inspection requested via web by Clint Tate rough-in ok cover concrete encased electrode
|
Electrical Rough-In | 8/16/2012 | 8/16/2012 | 8/16/2012 | P | NR |
Daryl DeGrange
|
|
|
Upher prior to pour. Late afternoon if at all possible. Please call Dave at ###-#### for more information Phone #: ###-#### >> Inspection requested via web by Clint Tate
|
Electrical Rough-In | 8/13/2012 | 8/13/2012 | 8/13/2012 | P | PASS |
Daryl DeGrange
|
|
|
Underground Phone #: ###-#### >> Inspection requested via web by Clint Tate rough-in ok cover conduit for phone and data
|
Conference | 8/9/2012 | 8/13/2012 | 8/13/2012 | A | PASS |
Daryl DeGrange
|
|
|
Consult with Dave Baugh ###-#### Phone #: ###-#### >> Inspection requested via web by Clint Tate Questions about changing service from aproved plans
|