Final | 7/23/2014 | 7/23/2014 | 7/23/2014 | P | PASS |
Rex Boyles
|
|
|
Phone #: ###-#### Inspection requested via web by Sean DeLacy final ok NOTE: Tony Keen with Lea Electric says they will take responsibilty for remaining work associated with underground and fire pump work.
|
ELE-Aging Inspection | 7/22/2014 | 7/22/2014 | 7/23/2014 | | DONE |
Rex Boyles
|
|
|
spoke with Shawn and he will call for final on u.g.
|
Electrical Rough-In | 4/18/2014 | 4/21/2014 | 4/21/2014 | A | PASS |
Rex Boyles
|
|
|
Jim. Underground. Phone #: ###-#### >> Inspection requested via web by Sean DeLacy rough in u.g. conduits to generators ok to cover
|
Electrical Rough-In | 4/9/2014 | 4/10/2014 | 4/10/2014 | P | PASS |
Rex Boyles
|
|
|
Jim. Duct bank conduits & vaults. Phone #: ###-#### >> Inspection requested via web by Sean DeLacy u/g secondary duct bank to elect. rm "OB-GO2" ok to cover. inspect electrical vault pull boxes for emergency power conduits ok
|
Electrical Rough-In | 2/19/2013 | 2/20/2013 | 2/20/2013 | A | PASS |
Rock A. Hudson
|
|
|
Dave. Phone #: ###-#### >> Inspection requested via web by Sean DeLacy Area a underground rough in ok cover
|
Electrical Rough-In | 12/27/2012 | 12/28/2012 | 12/28/2012 | A | PASS |
Daryl DeGrange
|
|
|
Electrical underground and grounding for tower crane. Phone #: ###-#### >> Inspection requested via web by Buster Bowen rough-in ok cover crane conduits
|
Electrical Rough-In | 11/7/2012 | 11/8/2012 | 11/8/2012 | A | PASS |
Daryl DeGrange
|
|
|
Dave. Phone #: ###-#### >> Inspection requested via web by Sean DeLacy rough-in ok cover underground duct bank
|
Electrical Rough-In | 10/22/2012 | 10/23/2012 | 10/23/2012 | A | PASS |
Rock A. Hudson
|
|
|
DAVE. UNDERGROUND. Phone #: ###-#### >> Inspection requested via web by Sean DeLacy Utility feeds rough in ok cover
|
Electrical Rough-In | 10/10/2012 | 10/11/2012 | 10/11/2012 | A | PASS |
Rock A. Hudson
|
|
|
Dave. Underground. Phone #: ###-#### >> Inspection requested via web by Sean DeLacy Generator feeds to south of building ok cover
|
Electrical Rough-In | 10/2/2012 | 10/3/2012 | 10/3/2012 | A | PASS |
Rock A. Hudson
|
|
|
Dave. Underground. Phone #: ###-#### >> Inspection requested via web by Sean DeLacy Inspected under ground. Main distribution conduits to helix
|
Electrical Rough-In | 9/25/2012 | 9/26/2012 | 9/25/2012 | A | PART |
Doug A Poedy
|
|
|
Dave. Underground. Phone #: ###-#### >> Inspection requested via web by Sean DeLacy. Section D of underground conduit looks good. Ok to cover. Signed off section on prints.
|
Conference | 8/13/2012 | 8/13/2012 | 8/13/2012 | P | DONE |
Daryl DeGrange
|
|
|
Dave. Phone #: ###-#### >> Inspection requested via web by Sean DeLacy Seeking exception to article 300.5 dept of conduits under basement parking garage, do to rubber membrane for ground water seepage. Allow branch circuits only, 12 inch concrete pour, IMC or Ridge raceway only.
|