Electrical Rough-In | 11/5/2012 | 11/5/2012 | 11/5/2012 | P | PASS |
Doug A Poedy
|
|
|
Please call Andy @ ###-#### with questions. Phone #: ###-#### >> Inspection requested via web by Amie Rose
|
Final | 11/5/2012 | 11/5/2012 | 11/5/2012 | P | PASS |
Doug A Poedy
|
|
|
Please call Andy @ ###-#### with questions. Phone #: ###-#### >> Inspection requested via web by Amie Rose
|
Final | 8/15/2012 | 8/16/2012 | 8/15/2012 | A | CANC |
Doug A Poedy
|
|
|
Added (5) exit signs: (2) in playland area @ exit doors to outside, (1) @ door to Playland from Dining Room, (1) at the main entrance to building, & (1) @ exit door from Kitchen to outside. If questions, please call Jim @ ###-####. Phone #: ###-#### >> Inspection requested via web by Amie Rose
|
Electrical Rough-In | 8/15/2012 | 8/16/2012 | 8/15/2012 | A | FAIL |
Doug A Poedy
|
|
|
Added (5) exit signs: (2) in playland area @ exit doors to outside, (1) @ door to Playland from Dining Room, (1) at the main entrance to building, & (1) @ exit door from Kitchen to outside. If questions, please call Jim @ ###-####. Phone #: ###-#### >> Inspection requested via web by Amie Rose. 1 exit sign came loose and is not secure. Must see manufacturing installation instructions.
|