Final | 12/28/2012 | 12/28/2012 | 12/28/2012 | P | PASS |
Daryl DeGrange
|
|
|
Phone #: ###-#### >> Inspection requested via web by Bryan McLaughlin final ok
|
Electrical Rough-In | 12/26/2012 | 12/27/2012 | 12/27/2012 | A | PASS |
Daryl DeGrange
|
|
|
ceiling bar area Phone #: ###-#### >> Inspection requested via web by Bryan McLaughlin correction done rough-in ok cover ceiling grid over bar area
|
Electrical Rough-In | 12/26/2012 | 12/26/2012 | 12/26/2012 | P | FAIL |
Daryl DeGrange
|
|
|
ceiling bar area, already ready Phone #: ###-#### >> Inspection requested via web by Bryan McLaughlin Not all MC terminated, low voltage wiring laying on grid, over half of grid tiles already installed
|
Final | 12/17/2012 | 12/17/2012 | 12/17/2012 | P | PART |
Daryl DeGrange
|
|
|
partial final for kitchen area only
|
Electrical Rough-In | 12/17/2012 | 12/17/2012 | 12/17/2012 | P | CANC |
Daryl DeGrange
|
|
|
kitchen Phone #: ###-#### >> Inspection requested via web by Bryan McLaughlin
|
Electrical Rough-In | 12/17/2012 | 12/17/2012 | 12/17/2012 | A | FAIL |
Daryl DeGrange
|
|
|
kitchen Phone #: ###-#### >> Inspection requested via web by Bryan McLaughlin not all receptacle have GFCI protection
|
Electrical Rough-In | 12/14/2012 | 12/14/2012 | 12/14/2012 | P | CANC |
Daryl DeGrange
|
|
|
Kitchen Phone #: ###-#### >> Inspection requested via web by Bryan McLaughlin request by contractor
|
Electrical Rough-In | 12/12/2012 | 12/13/2012 | 12/13/2012 | A | PASS |
Daryl DeGrange
|
|
|
kitchen and back of house ceilings. 8am if possible. Phone #: ###-#### >> Inspection requested via web by Bryan McLaughlin rough-in ok cover ceiling grid kitchen and back area
|
Conference | 12/7/2012 | 12/10/2012 | 12/10/2012 | A | DONE |
Daryl DeGrange
|
|
|
(9am?)Dave Dixon -- conf w/ele, fire, mike J., alan Phone #: ###-#### Discuss requirements for temporary ocupancy
|
Electrical Rough-In | 11/12/2012 | 11/13/2012 | 11/13/2012 | A | PASS |
Daryl DeGrange
|
|
|
hard lid ceiling Phone #: ###-#### >> Inspection requested via web by Bryan McLaughlin rough-in ok cover hard lid south entry area
|
Electrical Rough-In | 11/1/2012 | 11/2/2012 | 11/2/2012 | A | PASS |
Bob Reichert
|
|
|
wall and hard lid Phone #: ###-#### >> Inspection requested via web by Bryan McLaughlin wall, hardlid, and soffit south side anop ok cover
|
Electrical Rough-In | 10/22/2012 | 10/23/2012 | 10/23/2012 | A | PASS |
Daryl DeGrange
|
|
|
walls Phone #: ###-#### >> Inspection requested via web by Bryan McLaughlin rough-in ok cover east and south walls in front entry area
|
Electrical Rough-In | 10/1/2012 | 10/2/2012 | 10/2/2012 | A | PASS |
Daryl DeGrange
|
|
|
wall rough-in Phone #: ###-#### >> Inspection requested via web by Bryan McLaughlin rough-in ok cover walls as marked and dated on plans NEC 110.26 Personal door shall open in direction of egress and be equipped with panic bar (service equipment room)
|
Electrical Rough-In | 9/25/2012 | 9/25/2012 | 9/25/2012 | P | PASS |
Daryl DeGrange
|
|
|
wall rough Phone #: ###-#### >> Inspection requested via web by Bryan McLaughlin rough-in ok cover walls and 3 columns as marked and dated on print
|
Electrical Rough-In | 9/18/2012 | 9/18/2012 | 9/18/2012 | A | PASS |
Bob Reichert
|
|
|
wall rough in Phone #: ###-#### >> Inspection requested via web by Bryan McLaughlin wall ok anop
|
Electrical Rough-In | 9/6/2012 | 9/7/2012 | 9/7/2012 | A | PASS |
Bob Reichert
|
|
|
underground concrete pour scheduled for 8:30, please inspect as close to 8am as possible. Phone #: ###-#### >> Inspection requested via web by Bryan McLaughlin u/g ok, walls ok anop
|
Electrical Rough-In | 8/31/2012 | 9/4/2012 | 9/4/2012 | A | PASS |
Bob Reichert
|
|
|
partial wall, floor Phone #: ###-#### >> Inspection requested via web by Bryan McLaughlin walls and u/g anop ok
|