Final | 10/1/2012 | 10/2/2012 | 10/2/2012 | A | PASS |
Bob Reichert
|
|
|
Labeled the panel and secured the 1/2" Liquidtite. Phone #: ###-#### >> Inspection requested via web by Craig Korell ok final
|
Permanent Service | 10/2/2012 | 10/2/2012 | 10/2/2012 | A | PASS |
Bob Reichert
|
|
|
Labeled the panel and secured the 1/2" Liquidtite. Phone #: ###-#### >> Inspection requested via web by Craig Korell p/s, u/g, exst pedestal, rec, ok
|
Final | 9/30/2012 | 10/1/2012 | 10/1/2012 | A | FAIL |
Bob Reichert
|
|
|
Phone #: ###-#### >> Inspection requested via web by Craig Korell called, shall support lfnc within 12" of box, shall provide circuit directory
|
Permanent Service | 9/25/2012 | 9/26/2012 | 9/26/2012 | A | FAIL |
Doug A Poedy
|
|
|
Im not sure if the address has been posted yet. It is in the back of the park. Next to #12 or #16. Could you please final it also. Phone #: ###-#### >> Inspection requested via web by Craig Korell. Needs to secure box and conduit under trailor. Underground ok.
|