Final | 6/28/2013 | 6/28/2013 | 6/28/2013 | P | PASS |
Daryl DeGrange
|
|
|
Contact is Carl Petteck ###-#### Phone #: ###-#### >> Inspection requested via web by Scott Campbell correction done final ok
|
Final | 6/26/2013 | 6/27/2013 | 6/27/2013 | P | NR |
Daryl DeGrange
|
|
|
Contact is Ryan Sorrich Phone #: ###-#### >> Inspection requested via web by Scott Campbell service panel directories not site
|
Final | 6/26/2013 | 6/27/2013 | 6/26/2013 | A | CANC |
Daryl DeGrange
|
|
|
Contact is Ryan Sorich ###-#### Phone #: ###-#### >> Inspection requested via web by Scott Campbell Inspection cancelled from web by: Scott Campbell
|
Electrical Rough-In | 5/28/2013 | 5/29/2013 | 5/29/2013 | P | PASS |
Daryl DeGrange
|
|
|
Ceiling inspection - contact: Ryan Sorich ###-####. Phone #: ###-#### >> Inspection requested via web by Scott Campbell rough-in ok cover ceiling grid
|
Permanent Service | 4/25/2013 | 5/1/2013 | 5/1/2013 | P | PASS |
Daryl DeGrange
|
|
|
Service inspection - contact is Ryan Sorrich Phone #: ###-#### >> Inspection requested via web by Scott Campbell p/s u/g n ok
|
Permanent Service | 3/26/2013 | 3/26/2013 | 3/26/2013 | P | NR |
Daryl DeGrange
|
|
|
Contact is Ben MacDonagh Phone #: ###-#### >> Inspection requested via web by Scott Campbell Not ready wrong job called for inspection
|
Electrical Rough-In | 3/6/2013 | 3/7/2013 | 3/7/2013 | A | PASS |
Daryl DeGrange
|
|
|
Contact is Ryan Sorich Phone #: ###-#### >> Inspection requested via web by Scott Campbell rough-in ok cover walls
|
Electrical Rough-In | 2/19/2013 | 2/19/2013 | 2/19/2013 | P | PASS |
Daryl DeGrange
|
|
|
grounding//Carl Phone #: ###-#### rough-in ok cover concrete encased electrode/building steel
|
Electrical Rough-In | 12/5/2012 | 12/5/2012 | 12/5/2012 | P | PASS |
Daryl DeGrange
|
|
|
Underground inspection - contact is Ryan Sorrich ###-#### Phone #: ###-#### >> Inspection requested via web by Scott Campbell corrections completed rough-in ok cover underground
|
Electrical Rough-In | 12/4/2012 | 12/5/2012 | 12/5/2012 | A | FAIL |
Daryl DeGrange
|
|
|
Underground inspection ###-#### Ryan Sorrich Phone #: ###-#### >> Inspection requested via web by Scott Campbell NEC 300.5(F) Backfill
|
Electrical Rough-In | 12/4/2012 | 12/4/2012 | 12/4/2012 | P | PASS |
Daryl DeGrange
|
|
|
Underground inspection - contact is Ryan Sorrich ###-#### Phone #: ###-#### >> Inspection requested via web by Scott Campbell rough-in ok cover repair of parking lot lighting conduit
|
Electrical Rough-In | 11/27/2012 | 11/27/2012 | 11/27/2012 | P | PASS |
Daryl DeGrange
|
|
|
Underground inspection - Contact is Ryan Sorrich ###-####. Phone #: ###-#### >> Inspection requested via web by Scott Campbell rough-in ok cover service entrance conduits- couplings installed
|
Electrical Rough-In | 11/16/2012 | 11/19/2012 | 11/19/2012 | A | PASS |
Daryl DeGrange
|
|
|
Contact Carl Petteck ###-#### - west area between Bldg and job trailer. Underground inspection. Phone #: ###-#### >> Inspection requested via web by Scott Campbell rough-in ok cover conduits on west end no closer than 20 ft of transformer, conduits not connected to transformer stubs Do not cover existing parking lot lighting conduits
|
Electrical Rough-In | 11/5/2012 | 11/5/2012 | 11/5/2012 | P | PASS |
Doug A Poedy
|
|
|
Ufer Grd. inspection - contact is Ryan Sorich ###-#### Phone #: ###-#### >> Inspection requested via web by Scott Campbell
|