Final | 6/17/2013 | 6/17/2013 | 6/17/2013 | P | PASS |
Daryl DeGrange
|
|
|
Vicki Phone #: ###-#### final ok
|
Final | 5/31/2013 | 6/4/2013 | 6/4/2013 | A | PASS |
Daryl DeGrange
|
|
|
Phone #: ###-#### >> Inspection requested via web by daniel bibikov t/s u/g n ok
|
Electrical Rough-In | 10/29/2012 | 10/29/2012 | 10/29/2012 | P | PASS |
Rock A. Hudson
|
|
|
vicki please call before going out Phone #: ###-#### Rough in ok cover
|
Electrical Rough-In | 10/25/2012 | 10/25/2012 | 10/25/2012 | P | FAIL |
Daryl DeGrange
|
|
|
Make-up in all boxes shall be complete with grounding conductors pigtailed for grounnding of devices apon rough-in inspection, NEC 300.4 Nail plates required were holes in studs are less than 1 1/4 in. from edge of framing member. NEC 406.11 Receptacle shall be of the tamper rsistant type ( UL listed)
|
Conference | 10/25/2012 | 10/25/2012 | 10/25/2012 | P | DONE |
Daryl DeGrange
|
|
|
Vicki-PLease call at least 30 mins prior to inspection or Rob @ ###-#### Phone #: ###-#### Discussed requirements for completing electrical of unfinished basement. Wiring mostly completed at time of conference, 12 AWG romex used to compete 15 ampere circuitry
|