Information based on query as of Friday, June 28, 2024.
Permit Information
Permit NumberELE12-02685
StatusFinaled
Name BLU STATIONS
Site Address 9100 S EISENMAN RD
Project NameNatural Gas Fueling Station
Customer Number 
ePlanReviewNo
Description
Electrical Permit - New: Installation of conduit, panels, signage for new fueling station NO OCCUPANCY will be granted under this permit. See BLD12-02737 for Occupancy.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final8/26/20138/26/20138/26/2013PPASS
DetailsBob Reichert
Phone #: ###-#### >> Inspection requested via web by Rhonda Zamagni ok final, signed card
Final6/13/20136/13/20136/13/2013PPART
DetailsBob Reichert
check for part final and t/o, Darin ###-#### looked at compressor room, left correction notice, NEC shall add covers on open boxes, shall repair broken flex, signed t/o card, will do final after fixed
Conference5/9/20135/9/20135/15/2013PFAIL
DetailsBob Reichert
please call prior to arrival Phone #: ###-#### >> Inspection requested via web by Rhonda Zamagni called, final inspection failed until resolve listing issues for dispensers
Conference5/7/20135/7/20135/7/2013PDONE
DetailsBob Reichert
re-opened permit, asked contractor tocall for conference to meet at site regarding listings and labels
Final4/26/20134/26/20134/26/2013PPASS
DetailsBob Reichert
Call 1/2 hour prior to arrival. Phone #: ###-#### >> Inspection requested via web by Rhonda Zamagni ok final, signed card
Final4/16/20134/16/20134/16/2013PPART
DetailsBob Reichert
Please call Darin 1/2 hour prior to arrival this afternoon Phone #: ###-#### >> Inspection requested via web by Rhonda Zamagni still wiring diesel pumps, potting conduits, will recall when done, signed t/o card
Conference3/5/20133/6/20133/6/2013PDONE
DetailsBob Reichert
Please call Darin with any questions Phone #: ###-#### >> Inspection requested via web by Rhonda Zamagni talked about labelling and listing for control panel, skids, and installation for pole bases, seal-offs appear to be ok
Electrical Rough-In12/28/201212/31/201212/31/2012APASS
DetailsBob Reichert
If not inspected on Friday 12/28 please inspect on Monday Morning Phone #: ###-#### >> Inspection requested via web by Rhonda Zamagni see 12/28/12 response, talked about seal-off locations
Electrical Rough-In12/28/201212/28/201212/28/2012PPASS
DetailsBob Reichert
Darin ###-#### ok cover u/g north of island and island for pumps
Rough-In Permanent Service12/14/201212/17/201212/17/2012APASS
DetailsBob Reichert
Call Darin with any questions Phone #: ###-#### >> Inspection requested via web by Rhonda Zamagni ri ok, p/s u/g n ok
Rough-In Permanent Service12/14/201212/14/201212/14/2012PNR
DetailsBob Reichert
Call Darin with any questions Phone #: ###-#### >> Inspection requested via web by Rhonda Zamagni grounding not done
Rough-In Permanent Service12/13/201212/14/201212/14/2012ACANC
DetailsBob Reichert
Please contact Darin with any questions. Phone #: ###-#### >> Inspection requested via web by Rhonda Zamagni see conf
Conference12/14/201212/14/201212/14/2012ADONE
DetailsBob Reichert
Please contact Darin with any questions. Phone #: ###-#### >> Inspection requested via web by Rhonda Zamagni talked about grounding for remote buildings, service
Rough-In Permanent Service12/6/201212/7/201212/7/2012PCANC
DetailsBob Reichert
Please call Darin prior to coming out Phone #: ###-#### >> Inspection requested via web by Rhonda Zamagni see ri
Electrical Rough-In12/7/201212/7/201212/7/2012PPASS
DetailsBob Reichert
Please call Darin prior to coming out Phone #: ###-#### >> Inspection requested via web by Rhonda Zamagni ok cover u/g west of island
Rough-In Permanent Service11/30/201212/3/201212/3/2012ACANC
DetailsBob Reichert
Please call Darin with any questions Phone #: ###-#### >> Inspection requested via web by Rhonda Zamagni see ri
Electrical Rough-In12/3/201212/3/201212/3/2012PPART
DetailsBob Reichert
Please call Darin with any questions Phone #: ###-#### >> Inspection requested via web by Rhonda Zamagni looked at u/g from transformer to building, told contractor that is ipco part to ok, but looked ok to 370, once covered, can work on service
Conference11/21/201211/26/201211/26/2012ADONE
DetailsBob Reichert
Please call Darin prior arrival, conference regarding conduit cover. Phone #: ###-#### >> Inspection requested via web by Rhonda Zamagni talked about seal-offs, locations, heights, conduit depths, concrete encasement for u/g
Electrical Rough-In11/12/201211/13/201211/13/2012APASS
DetailsBob Reichert
Please call Darin prior to arrival @ ###-#### Phone #: ###-#### >> Inspection requested via web by Rhonda Zamagni ok pour tank pad only
Electrical Rough-In11/8/201211/8/201211/8/2012PFAIL
DetailsBob Reichert
Darren Phone #: ###-#### met contractor and general, they will have to change pad design, then recall
Electrical Rough-In11/7/201211/8/201211/8/2012ANR
DetailsBob Reichert
Please call Darin @ ###-####, for a cover inspection Phone #: ###-#### >> Inspection requested via web by Rhonda Zamagni met electrician, still installing conduit, told that they shall supply area classification drawing and that pvc shall be 24" below top of concrete if class 1 div 1 per NEC 501.10
Electrical Rough-In11/6/201211/7/201211/7/2012PNR
DetailsBob Reichert
underground work for a concrete pad. Please call Darin prior to arrival @ ###-#### Phone #: ###-#### >> Inspection requested via web by Rhonda Zamagni called, contractor wants am for 11-8-12