Final | 8/26/2013 | 8/26/2013 | 8/26/2013 | P | PASS |
Bob Reichert
|
|
|
Phone #: ###-#### >> Inspection requested via web by Rhonda Zamagni ok final, signed card
|
Final | 6/13/2013 | 6/13/2013 | 6/13/2013 | P | PART |
Bob Reichert
|
|
|
check for part final and t/o, Darin ###-#### looked at compressor room, left correction notice, NEC shall add covers on open boxes, shall repair broken flex, signed t/o card, will do final after fixed
|
Conference | 5/9/2013 | 5/9/2013 | 5/15/2013 | P | FAIL |
Bob Reichert
|
|
|
please call prior to arrival Phone #: ###-#### >> Inspection requested via web by Rhonda Zamagni called, final inspection failed until resolve listing issues for dispensers
|
Conference | 5/7/2013 | 5/7/2013 | 5/7/2013 | P | DONE |
Bob Reichert
|
|
|
re-opened permit, asked contractor tocall for conference to meet at site regarding listings and labels
|
Final | 4/26/2013 | 4/26/2013 | 4/26/2013 | P | PASS |
Bob Reichert
|
|
|
Call 1/2 hour prior to arrival. Phone #: ###-#### >> Inspection requested via web by Rhonda Zamagni ok final, signed card
|
Final | 4/16/2013 | 4/16/2013 | 4/16/2013 | P | PART |
Bob Reichert
|
|
|
Please call Darin 1/2 hour prior to arrival this afternoon Phone #: ###-#### >> Inspection requested via web by Rhonda Zamagni still wiring diesel pumps, potting conduits, will recall when done, signed t/o card
|
Conference | 3/5/2013 | 3/6/2013 | 3/6/2013 | P | DONE |
Bob Reichert
|
|
|
Please call Darin with any questions Phone #: ###-#### >> Inspection requested via web by Rhonda Zamagni talked about labelling and listing for control panel, skids, and installation for pole bases, seal-offs appear to be ok
|
Electrical Rough-In | 12/28/2012 | 12/31/2012 | 12/31/2012 | A | PASS |
Bob Reichert
|
|
|
If not inspected on Friday 12/28 please inspect on Monday Morning Phone #: ###-#### >> Inspection requested via web by Rhonda Zamagni see 12/28/12 response, talked about seal-off locations
|
Electrical Rough-In | 12/28/2012 | 12/28/2012 | 12/28/2012 | P | PASS |
Bob Reichert
|
|
|
Darin ###-#### ok cover u/g north of island and island for pumps
|
Rough-In Permanent Service | 12/14/2012 | 12/17/2012 | 12/17/2012 | A | PASS |
Bob Reichert
|
|
|
Call Darin with any questions Phone #: ###-#### >> Inspection requested via web by Rhonda Zamagni ri ok, p/s u/g n ok
|
Rough-In Permanent Service | 12/14/2012 | 12/14/2012 | 12/14/2012 | P | NR |
Bob Reichert
|
|
|
Call Darin with any questions Phone #: ###-#### >> Inspection requested via web by Rhonda Zamagni grounding not done
|
Rough-In Permanent Service | 12/13/2012 | 12/14/2012 | 12/14/2012 | A | CANC |
Bob Reichert
|
|
|
Please contact Darin with any questions. Phone #: ###-#### >> Inspection requested via web by Rhonda Zamagni see conf
|
Conference | 12/14/2012 | 12/14/2012 | 12/14/2012 | A | DONE |
Bob Reichert
|
|
|
Please contact Darin with any questions. Phone #: ###-#### >> Inspection requested via web by Rhonda Zamagni talked about grounding for remote buildings, service
|
Rough-In Permanent Service | 12/6/2012 | 12/7/2012 | 12/7/2012 | P | CANC |
Bob Reichert
|
|
|
Please call Darin prior to coming out Phone #: ###-#### >> Inspection requested via web by Rhonda Zamagni see ri
|
Electrical Rough-In | 12/7/2012 | 12/7/2012 | 12/7/2012 | P | PASS |
Bob Reichert
|
|
|
Please call Darin prior to coming out Phone #: ###-#### >> Inspection requested via web by Rhonda Zamagni ok cover u/g west of island
|
Rough-In Permanent Service | 11/30/2012 | 12/3/2012 | 12/3/2012 | A | CANC |
Bob Reichert
|
|
|
Please call Darin with any questions Phone #: ###-#### >> Inspection requested via web by Rhonda Zamagni see ri
|
Electrical Rough-In | 12/3/2012 | 12/3/2012 | 12/3/2012 | P | PART |
Bob Reichert
|
|
|
Please call Darin with any questions Phone #: ###-#### >> Inspection requested via web by Rhonda Zamagni looked at u/g from transformer to building, told contractor that is ipco part to ok, but looked ok to 370, once covered, can work on service
|
Conference | 11/21/2012 | 11/26/2012 | 11/26/2012 | A | DONE |
Bob Reichert
|
|
|
Please call Darin prior arrival, conference regarding conduit cover. Phone #: ###-#### >> Inspection requested via web by Rhonda Zamagni talked about seal-offs, locations, heights, conduit depths, concrete encasement for u/g
|
Electrical Rough-In | 11/12/2012 | 11/13/2012 | 11/13/2012 | A | PASS |
Bob Reichert
|
|
|
Please call Darin prior to arrival @ ###-#### Phone #: ###-#### >> Inspection requested via web by Rhonda Zamagni ok pour tank pad only
|
Electrical Rough-In | 11/8/2012 | 11/8/2012 | 11/8/2012 | P | FAIL |
Bob Reichert
|
|
|
Darren Phone #: ###-#### met contractor and general, they will have to change pad design, then recall
|
Electrical Rough-In | 11/7/2012 | 11/8/2012 | 11/8/2012 | A | NR |
Bob Reichert
|
|
|
Please call Darin @ ###-####, for a cover inspection Phone #: ###-#### >> Inspection requested via web by Rhonda Zamagni met electrician, still installing conduit, told that they shall supply area classification drawing and that pvc shall be 24" below top of concrete if class 1 div 1 per NEC 501.10
|
Electrical Rough-In | 11/6/2012 | 11/7/2012 | 11/7/2012 | P | NR |
Bob Reichert
|
|
|
underground work for a concrete pad. Please call Darin prior to arrival @ ###-#### Phone #: ###-#### >> Inspection requested via web by Rhonda Zamagni called, contractor wants am for 11-8-12
|