Final | 10/21/2013 | 10/22/2013 | 10/21/2013 | A | PASS |
Daryl DeGrange
|
|
|
Karl Phone #: ###-#### final ok
|
Electrical Rough-In | 2/28/2013 | 3/1/2013 | 3/1/2013 | A | PASS |
Daryl DeGrange
|
|
|
KARL please call 30 min before going out Phone #: ###-#### rough-in ok cover bath fan and recessed can lighting
|
Conference | 2/12/2013 | 2/14/2013 | 2/14/2013 | P | DONE |
Daryl DeGrange
|
|
|
Karl-Please call prior to inspection Phone #: ###-#### Discussed with homeowner requirements for installing two bulb heater in hall bathroom and listed lighting fixture above tub/shower stall
|