Final | 3/15/2013 | 3/18/2013 | 3/18/2013 | A | PASS |
Daryl DeGrange
|
|
|
Toby Phone #: ###-#### >> Inspection requested via web by Sean DeLacy final ok
|
Final | 3/13/2013 | 3/14/2013 | 3/14/2013 | A | FAIL |
Daryl DeGrange
|
|
|
Phone #: ###-#### >> Inspection requested via web by Sean DeLacy Not ready for final inspection
|
Electrical Rough-In | 11/29/2012 | 11/29/2012 | 11/29/2012 | P | PASS |
Bob Reichert
|
|
|
Levi. Phone #: ###-#### >> Inspection requested via web by Sean DeLacy breaker up-sized to 22kaic per contractor
|
Permanent Service | 11/20/2012 | 11/21/2012 | 11/21/2012 | P | PASS |
Daryl DeGrange
|
|
|
LEVI Phone #: ###-#### >> Inspection requested via web by Sean DeLacy conditional p/s u/g rec ok
|
Electrical Rough-In | 11/16/2012 | 11/19/2012 | 11/19/2012 | P | CANC |
Daryl DeGrange
|
|
|
Levi Phone #: ###-#### >> Inspection requested via web by Sean DeLacy Inspection cancelled from web by: Sean DeLacy
|
Electrical Rough-In | 11/16/2012 | 11/16/2012 | 11/16/2012 | P | PASS |
Daryl DeGrange
|
|
|
rough-in ok cover underground conduits
|
Electrical Rough-In | 11/15/2012 | 11/15/2012 | 11/15/2012 | P | PART |
Bob Reichert
|
|
|
Levi. Phone #: ###-#### >> Inspection requested via web by Sean DeLacy ok cover u/g by building outside, west side, shall see rest of u/g for spacing and depth, NOTE: check out number of services to building
|