Final | 12/7/2012 | 12/7/2012 | 12/7/2012 | P | PASS |
Daryl DeGrange
|
|
|
Final inspection after Even Green installed the required tag. Call with any questions. Thanks Daryl. Eric ###-#### Phone #: ###-#### >> Inspection requested via web by Eric Schroeder final ok
|
Final | 11/20/2012 | 11/20/2012 | 11/20/2012 | A | NR |
Daryl DeGrange
|
|
|
Final inspection of solar array. Please call for a time to meet you out there with ladder. Thanks Daryl.
Eric ###-#### Phone #: ###-#### >> Inspection requested via web by Eric Schroeder
|
Electrical Rough-In | 11/20/2012 | 11/20/2012 | 11/20/2012 | A | PASS |
Daryl DeGrange
|
|
|
rough-in ok ETL listed solar panels
|
Final | 11/19/2012 | 11/19/2012 | 11/19/2012 | P | CANC |
Bob Reichert
|
|
|
Final inspection. Please call and I will try to meet you there to inspect with ladder. Thanks, Eric Phone #: ###-#### >> Inspection requested via web by Eric Schroeder contractor asked to reschedule
|
Final | 11/16/2012 | 11/16/2012 | 11/16/2012 | P | NH |
Daryl DeGrange
|
|
|
Inspect solar array. Call with any questions. Thanks, Eric ###-#### Phone #: ###-#### >> Inspection requested via web by Eric Schroeder No access to solar panels
|