Final | 7/24/2013 | 7/24/2013 | 7/24/2013 | P | PASS |
Daryl DeGrange
|
|
|
Pedro Phone #: ###-#### final ok
|
Final | 7/22/2013 | 7/22/2013 | 7/22/2013 | P | NR |
Daryl DeGrange
|
|
|
PEDRO Phone #: ###-#### Not ready for final at this time
|
Permanent Service | 7/22/2013 | 7/22/2013 | 7/22/2013 | P | PASS |
Daryl DeGrange
|
|
|
p/s o/h rec ok
|
Conference | 7/17/2013 | 7/17/2013 | 7/18/2013 | P | DONE |
Daryl DeGrange
|
|
|
pedro Phone #: ###-#### Discussed with home owner requirements for raiseing overhead mask to incoming service feeders, clearances for service panel
|
Conference | 6/24/2013 | 6/24/2013 | 6/24/2013 | P | DONE |
Daryl DeGrange
|
|
|
pedro Phone #: ###-#### Discussed with homeowner requirements for service upgrade, overhead service conductors clearance, grounding
|
ELE-Request for Extension | 5/2/2013 | 5/3/2013 | 5/3/2013 | A | PASS |
Daryl DeGrange
|
|
|
pedro Phone #: ###-#### extension ok
|
Final | 4/3/2013 | 4/4/2013 | 4/4/2013 | A | FAIL |
Daryl DeGrange
|
|
|
pedro Phone #: ###-#### NEC 406.8(B)(1) Requires exterior receptacles to be listed WR weather resistance type, with weather-proof cover suitable for use in wet locations. Overhead service conductors don't meet minimun clearance reqirements do to new structure placement. NEC 110.26 required working clearance in front of service meter
|
Electrical Rough-In | 12/11/2012 | 12/12/2012 | 12/12/2012 | A | PASS |
Daryl DeGrange
|
|
|
pedro Phone #: ###-#### rough-in ok cover single room addition, Service panel working clearance, service mask height requirement and service panel access all must be adressed before final inspection will givien.
|
Conference | 12/4/2012 | 12/5/2012 | 12/5/2012 | A | DONE |
Daryl DeGrange
|
|
|
Pedro-Please call prior to inspection Phone #: ###-#### Discuss with homeowner requirements for wiring single room addition, advised homeonwer of overhead service clearance problem.
|