Final | 12/19/2012 | 12/21/2012 | 12/21/2012 | A | PASS |
Rock A. Hudson
|
|
|
finaling T12 to T8 retrofit. Phone #: ###-#### >> Inspection requested via web by Tim Dunlop Final ok
|
Electrical Rough-In | 12/6/2012 | 12/7/2012 | 12/7/2012 | A | PASS |
Rock A. Hudson
|
|
|
lighting retrofit rough in inspection. Retrofitting from T12-T8. Phone #: ###-#### >> Inspection requested via web by Tim Dunlop Checked UL listed materials. Rough in ok
|