Final | 3/28/2013 | 3/28/2013 | 3/28/2013 | P | PASS |
Bob Reichert
|
|
|
Please call Tony @ EKC 30 minutes prior. Phone #: ###-#### >> Inspection requested via web by Clint Tate ok final, signed card
|
Final | 3/27/2013 | 3/28/2013 | 3/28/2013 | A | CANC |
Bob Reichert
|
|
|
Please call Tony with EKC 30 minutes prior to arrival. Phone #: ###-#### >> Inspection requested via web by Clint Tate Inspection cancelled from web by: Clint Tate
|
Final | 2/21/2013 | 2/22/2013 | 2/22/2013 | A | FAIL |
Bob Reichert
|
|
|
Phone #: ###-#### >> Inspection requested via web by Clint Tate met contractor, checked clean room, BCC 4-05-33 (A)(B) all equipment shall be listed by a nationally recognized testing laboratory, NEC 110.3(A)(B) equipment shall be suitable for installation and use
|
Electrical Rough-In | 1/22/2013 | 1/22/2013 | 1/22/2013 | P | PASS |
Bob Reichert
|
|
|
Ceiling rough inspection. Rod on site. Phone #: ###-#### >> Inspection requested via web by Clint Tate 1st floor ceiling ok cover
|
Electrical Rough-In | 1/8/2013 | 1/9/2013 | 1/9/2013 | A | PASS |
Bob Reichert
|
|
|
Ceiling and wall 2nd floor roughin. Phone #: ###-#### >> Inspection requested via web by Clint Tate ri ok 2nd floor ceiling and wall
|
Electrical Rough-In | 12/27/2012 | 12/28/2012 | 12/28/2012 | A | PASS |
Bob Reichert
|
|
|
Ceiling, 1st floor. >> Inspection requested via web by Clint Tate 1st floor west wall and ceiling only ok cover
|