Final | 2/25/2013 | 2/25/2013 | 2/25/2013 | P | PASS |
Rock A. Hudson
|
|
|
THANKS Phone #: ###-#### >> Inspection requested via web by Bob Glenn final ok
|
Electrical Rough-In | 2/8/2013 | 2/8/2013 | 2/8/2013 | P | PASS |
Rock A. Hudson
|
|
|
tHIS IS FOR THE WARMFLOOR IN MASTER BATHROOM. Phone #: ###-#### >> Inspection requested via web by Bob Glenn Floor heat rough in ok cover
|
Rough-In Permanent Service | 1/9/2013 | 1/10/2013 | 1/10/2013 | A | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### >> Inspection requested via web by Bob Glenn Rough in ok Cover Service pending on removal of trash receptical located in front of meter base. p/s u/g n ok
|