Final | 2/8/2013 | 2/11/2013 | 2/11/2013 | A | PASS |
Daryl DeGrange
|
|
|
Tyler Phone #: ###-#### final ok
|
Electrical Rough-In | 2/7/2013 | 2/8/2013 | 2/8/2013 | A | PASS |
Daryl DeGrange
|
|
|
Tyler Phone #: ###-#### rough-in ok install devices
|
Conference | 1/10/2013 | 1/10/2013 | 1/10/2013 | P | DONE |
Daryl DeGrange
|
|
|
call when on way//Tyler Phone #: ###-#### Discussed requirements for piping in 20 ampere 240 volt branch circuit
|