Final | 1/29/2013 | 1/30/2013 | 1/30/2013 | A | PASS |
Bob Reichert
|
|
|
Place should be open Phone #: ###-#### >> Inspection requested via web by John Edwards ok final, signed card
|
Final | 1/24/2013 | 1/24/2013 | 1/24/2013 | P | PART |
Bob Reichert
|
|
|
Phone #: ###-#### >> Inspection requested via web by John Edwards ok except shall finish furniture, add panel schedules, signed card
|
Electrical Rough-In | 1/11/2013 | 1/11/2013 | 1/11/2013 | P | PASS |
Bob Reichert
|
|
|
Phone #: ###-#### >> Inspection requested via web by John Edwards ok cover ceiling big room
|
Electrical Rough-In | 1/10/2013 | 1/11/2013 | 1/11/2013 | A | FAIL |
Bob Reichert
|
|
|
Ceiling rough-in >> Inspection requested via web by John Edwards called, shall remove abandoned lv cable, cover boxes, strap raceways
|