Final | 5/31/2013 | 6/3/2013 | 6/3/2013 | P | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### >> Inspection requested via web by Zane Robertson Final ok
|
Electrical Rough-In | 4/23/2013 | 4/24/2013 | 4/24/2013 | A | PASS |
Bob Reichert
|
|
|
Grid inspection Phone #: ###-#### >> Inspection requested via web by Zane Robertson corrections made, ok cover ceiling
|
Electrical Rough-In | 4/18/2013 | 4/19/2013 | 4/19/2013 | A | FAIL |
Bob Reichert
|
|
|
Grid inspection Phone #: ###-#### >> Inspection requested via web by Zane Robertson called, there shall be no low voltage wiring on grid or tiles per NEC 300.11, left correction notice
|
Rough-In Permanent Service | 2/20/2013 | 2/21/2013 | 2/21/2013 | P | PASS |
Bob Reichert
|
|
|
Phone #: ###-#### >> Inspection requested via web by Zane Robertson ri ok, p/s u/g n ok
|
Rough-In Permanent Service | 2/20/2013 | 2/20/2013 | 2/20/2013 | P | NR |
Bob Reichert
|
|
|
Phone #: ###-#### >> Inspection requested via web by Zane Robertson called in wrong day, still working on
|
Electrical Rough-In | 2/7/2013 | 2/8/2013 | 2/8/2013 | A | PASS |
Bob Reichert
|
|
|
Soffit inspection Phone #: ###-#### >> Inspection requested via web by Zane Robertson outside soffits only ok cover
|
Electrical Rough-In | 2/6/2013 | 2/7/2013 | 2/7/2013 | P | FAIL |
Bob Reichert
|
|
|
Soffit cans need looked at for cover Phone #: ###-#### >> Inspection requested via web by Zane Robertson met contractor, shall staple mc cable within 12" of box per NEC330.30(B)
|