Final | 7/12/2013 | 7/12/2013 | 7/12/2013 | A | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### >> Inspection requested via web by Karl Paige Final ok
|
Final | 7/10/2013 | 7/11/2013 | 7/11/2013 | A | CANC |
Rock A. Hudson
|
|
|
Phone #: ###-#### >> Inspection requested via web by Karl Paige Inspection cancelled from web by: Karl Paige
|
Electrical Rough-In | 7/2/2013 | 7/3/2013 | 7/3/2013 | A | PASS |
Rock A. Hudson
|
|
|
need a ceiling cover Phone #: ###-#### >> Inspection requested via web by Karl Paige Ceiling rough in ok cover
|
Electrical Rough-In | 6/30/2013 | 7/1/2013 | 7/1/2013 | A | FAIL |
Rock A. Hudson
|
|
|
CEILING COVER Phone #: ###-#### >> Inspection requested via web by Karl Paige 300.11 Low volt wiring shall be Supported offf grid. 314.23 All boxes shall be covered
|
Electrical Rough-In | 6/12/2013 | 6/12/2013 | 6/12/2013 | P | PASS |
Rock A. Hudson
|
|
|
Behind the temp wall 5 outlets in outside of room wall. Phone #: ###-#### >> Inspection requested via web by Karl Paige Wall rough in ok cover
|
Electrical Rough-In | 6/2/2013 | 6/3/2013 | 6/3/2013 | A | PASS |
Rock A. Hudson
|
|
|
we will be on site from 7am to 9am 6/3/2013 Phone #: ###-#### >> Inspection requested via web by Karl Paige Phase 2 wall rough in ok cover
|
Electrical Rough-In | 4/25/2013 | 4/26/2013 | 4/26/2013 | A | PART |
Rock A. Hudson
|
|
|
Call one hour before showing up on site. Will need to get into space thur 3rd party. Inspection is for a partial final. Owner moving from unfinished area into the finished area so we can continue with remodel. Phone #: ###-#### >> Inspection requested via web by Karl Paige Partial final on phase 1 ok occupy.
|
Electrical Rough-In | 3/21/2013 | 3/22/2013 | 3/22/2013 | A | PASS |
Rock A. Hudson
|
|
|
This is on third floor wall and ceiling for cover call before showing up limited access. Phone #: ###-#### >> Inspection requested via web by Karl Paige Walls and hard ceiling rough in ok
|