Final | 1/2/2014 | 1/3/2014 | 1/3/2014 | A | PASS |
Bob Reichert
|
|
|
Steve Hook is contact at ###-####. thank you. Phone #: ###-#### >> Inspection requested via web by Debby Ellis ok final, no card on site
|
Final | 11/19/2013 | 11/20/2013 | 11/20/2013 | A | PART |
Bob Reichert
|
|
|
Phone #: ###-#### >> Inspection requested via web by Debby Ellis need to see heat trace, cameras, receptacles for lights, signed t/o card
|
Electrical Rough-In | 10/11/2013 | 10/14/2013 | 10/14/2013 | A | PASS |
Bob Reichert
|
|
|
rough-in for stair tower 1. Steve Hook is contact ###-####. thank you. Phone #: ###-#### >> Inspection requested via web by Debby Ellis stair tower ok cover
|
Electrical Rough-In | 10/7/2013 | 10/8/2013 | 10/8/2013 | P | PASS |
Bob Reichert
|
|
|
underground, steve hook, ###-####. thanks. Phone #: ###-#### >> Inspection requested via web by Debby Ellis north site lighting u/g ok
|
Electrical Rough-In | 10/3/2013 | 10/3/2013 | 10/3/2013 | P | PASS |
Bob Reichert
|
|
|
underground gate, and generator, boise parking garage, Steve Hook is contact. ###-####. thank you. Phone #: ###-#### >> Inspection requested via web by Debby Ellis part u/g for gate, some u/g lighting leaving building towards gste u/g ok, generator install ok
|
Electrical Rough-In | 9/25/2013 | 9/26/2013 | 9/26/2013 | A | PART |
Doug A Poedy
|
|
|
final for the 4th floor ceiling only, steve hook, ###-####. thank you. Phone #: ###-#### >> Inspection requested via web by Debby Ellis. 4Th floor ceiling
|
Electrical Rough-In | 9/19/2013 | 9/20/2013 | 9/20/2013 | P | PART |
Bob Reichert
|
|
|
4th floor, partial ceiling rough-in. steve hooh is contact ###-####, thank you.. Phone #: ###-#### >> Inspection requested via web by Debby Ellis center areas ok cover for ceiling
|
Electrical Rough-In | 8/26/2013 | 8/26/2013 | 8/26/2013 | P | PASS |
Bob Reichert
|
|
|
stair tower 2. AM if possible... boise airport parking garage, steve hook is contact. ###-####. thank you. Phone #: ###-#### >> Inspection requested via web by Debby Ellis ri ok
|
Electrical Rough-In | 8/20/2013 | 8/21/2013 | 8/21/2013 | P | PASS |
Bob Reichert
|
|
|
4th floor slab, Steve Hook is contact ###-####. Phone #: ###-#### >> Inspection requested via web by Debby Ellis ok cover 4th floor slab
|
Electrical Rough-In | 8/14/2013 | 8/14/2013 | 8/14/2013 | P | PASS |
Bob Reichert
|
|
|
4th floor new parking garage, slab rough-in. contact is Steve Hook, ###-####. thank you. Phone #: ###-#### >> Inspection requested via web by Debby Ellis 4th floor slab ok pour
|
Electrical Rough-In | 7/24/2013 | 7/25/2013 | 7/25/2013 | P | PASS |
Bob Reichert
|
|
|
2nd level, concrete deck rough in. steve hook, ###-####. thank you. Phone #: ###-#### >> Inspection requested via web by Debby Ellis ok pour 2nd level deck
|
Electrical Rough-In | 7/22/2013 | 7/23/2013 | 7/23/2013 | A | PASS |
Bob Reichert
|
|
|
4th floor ceiling inspection, Steve Hook, ###-####. Phone #: ###-#### >> Inspection requested via web by Debby Ellis 4th floor ceiling ok cover
|
Electrical Rough-In | 7/22/2013 | 7/22/2013 | 7/22/2013 | P | CANC |
Bob Reichert
|
|
|
4th floor ceiling inspection, Steve Hook ###-####. Phone #: ###-#### >> Inspection requested via web by Debby Ellis Inspection cancelled from web by: Debby Ellis
|
Electrical Rough-In | 7/17/2013 | 7/17/2013 | 7/17/2013 | P | PASS |
Rock A. Hudson
|
|
|
Steve Hook is Contact, ###-####. underground rough-in on Generator Pad. Thank You. Phone #: ###-#### >> Inspection requested via web by Debby Ellis Underground conduits and ground to ground rods, Rough in ok cover
|
Electrical Rough-In | 7/12/2013 | 7/15/2013 | 7/15/2013 | A | PASS |
Daryl DeGrange
|
|
|
parking garage, 2nd floor deck rough in. contact is Steve Hook ###-####. thank you. Phone #: ###-#### >> Inspection requested via web by Debby Ellis rough-in ok cover/pour
|
Electrical Rough-In | 6/13/2013 | 6/14/2013 | 6/14/2013 | A | PASS |
Bob Reichert
|
|
|
steve hook is contact, ###-####. 4th floor slab rough in. thank you. Phone #: ###-#### >> Inspection requested via web by Debby Ellis ok pour rest of 4th floor
|
Electrical Rough-In | 6/6/2013 | 6/6/2013 | 6/6/2013 | P | PASS |
Bob Reichert
|
|
|
4TH FLOOR slab rough-in. Steve Hook is contact. Thank You. Phone #: ###-#### >> Inspection requested via web by Debby Ellis ok pour 4th floor slab
|
Electrical Rough-In | 5/17/2013 | 5/17/2013 | 5/17/2013 | P | PASS |
Rock A. Hudson
|
|
|
grounding column inspection, Steve Hook ###-####.thank you. Phone #: ###-#### >> Inspection requested via web by Debby Ellis North and northwest column grounding rough in ok cover
|
Electrical Rough-In | 5/16/2013 | 5/16/2013 | 5/16/2013 | P | PART |
Bob Reichert
|
|
|
3rd floor of new parking garage airport (slab rough-in. Steve Hook is contact. ###-####. thank you. Phone #: ###-#### >> Inspection requested via web by Debby Ellis east 1/2 3rd floor ok pour anop
|
Electrical Rough-In | 4/29/2013 | 4/29/2013 | 4/29/2013 | P | PASS |
Bob Reichert
|
|
|
2nd floor slab, Steve Hook is contact at ###-####, thank you. Phone #: ###-#### >> Inspection requested via web by Debby Ellis 2nd floor ok pour anop
|
Electrical Rough-In | 4/19/2013 | 4/22/2013 | 4/22/2013 | A | PASS |
Bob Reichert
|
|
|
Steve Hook is contact at ###-####, thank you. Phone #: ###-#### >> Inspection requested via web by Debby Ellis ok pour east 1/2 slab, 1st floor anop, ok temp lighting for stairs
|
Electrical Rough-In | 2/22/2013 | 2/25/2013 | 2/25/2013 | P | PASS |
Bob Reichert
|
|
|
Grounding Inspection, Steve Hook is contact. ###-####. thank you. Phone #: ###-#### >> Inspection requested via web by Debby Ellis south columns ok for grounding
|
Electrical Rough-In | 2/18/2013 | 2/19/2013 | 2/19/2013 | A | PART |
Bob Reichert
|
|
|
Grounding Inspection, Contact is Steve Hook ###-####... Phone #: ###-#### >> Inspection requested via web by Debby Ellis south end ground ring, columns poured, saw outside connections only, can't find others
|