Final | 4/1/2013 | 4/1/2013 | 4/1/2013 | P | PASS |
Daryl DeGrange
|
|
|
Please call Lynn at ###-#### if you have any questions. Phone #: ###-#### >> Inspection requested via web by Lynn Proctor UL listed equipment final ok
|
Final | 3/26/2013 | 3/26/2013 | 3/26/2013 | P | PART |
Daryl DeGrange
|
|
|
Lynn Phone #: ###-#### Partial final
|
Electrical Rough-In | 3/14/2013 | 3/14/2013 | 3/14/2013 | P | PASS |
Bob Reichert
|
|
|
(Re-inspect) Ceiling Grid Inspection. Please call Lynn Proctor at ###-#### is you have any questions, comments or concerns. Phone #: ###-#### >> Inspection requested via web by Lynn Proctor corrections made, ok cover ceiling only
|
Electrical Rough-In | 3/13/2013 | 3/14/2013 | 3/14/2013 | A | FAIL |
Bob Reichert
|
|
|
Ceiling Grid Inspection. The site is ready for inspection. If it is at all possible to swing by this afternoon it would be very much appreciated. Please call Lynn at ###-#### if you have any questions, comments or concerns. Phone #: ###-#### >> Inspection requested via web by Lynn Proctor called, told contractor that mc cable shall not rest on tiles or grid, shall securely strap mc cable within 12" of boxes, shall not have lv cables on grid
|
Electrical Rough-In | 2/19/2013 | 2/20/2013 | 2/20/2013 | A | PASS |
Daryl DeGrange
|
|
|
Please call Lynn at ###-#### if you have any questions. Phone #: ###-#### >> Inspection requested via web by Lynn Proctor rough-in ok cover walls
|