Final | 3/6/2013 | 3/7/2013 | 3/7/2013 | A | PASS |
Rock A. Hudson
|
|
|
Please call Eric Hansen if any questions Phone #: ###-#### >> Inspection requested via web by brad williams Service final ok
|
Final | 3/5/2013 | 3/5/2013 | 3/5/2013 | P | FAIL |
Rock A. Hudson
|
|
|
Please call Eric Hansen if any questions. This inspection is for meterbase only. Poles/bases have been inspected by BCPW. Phone #: ###-#### >> Inspection requested via web by brad williams NEC 300.5 H- A bushing shall be used at the end of the conduit on load side of service.
|
Permanent Service | 3/5/2013 | 3/5/2013 | 3/5/2013 | P | PASS |
Rock A. Hudson
|
|
|
Please call Eric Hansen if any questions. This inspection is for meterbase only. Poles/bases have been inspected by BCPW. Phone #: ###-#### >> Inspection requested via web by brad williams Check for bushing on 2" conduits on load side of service. p/s u/g n ok
|