Final | 5/21/2013 | 5/22/2013 | 5/22/2013 | A | PASS |
Rock A. Hudson
|
|
|
John Phone #: ###-#### Final ok
|
Final | 5/14/2013 | 5/15/2013 | 5/15/2013 | A | FAIL |
Rock A. Hudson
|
|
|
JOHN Phone #: ###-#### Switch cover needed for master stool, receptical in master bed not working, TV power cord fished down wall to be removed
|
Electrical Rough-In | 3/29/2013 | 4/1/2013 | 4/1/2013 | A | PASS |
Rock A. Hudson
|
|
|
john please call 30 min before going out Phone #: ###-#### Master bed and bath remodel rough in ok cover
|
Conference | 3/26/2013 | 3/27/2013 | 3/27/2013 | A | DONE |
Rock A. Hudson
|
|
|
john - call 15 mins prior for access Phone #: ###-#### Discussed master bed and bath remodel code required outlets for bed and bath, smoke detectors, NM cable supports on stud members
|