Final | 9/17/2013 | 9/17/2013 | 9/17/2013 | P | PASS |
Rock A. Hudson
|
|
|
Treon-Please call at least 30 mins prior to insepction Phone #: ###-#### Final ok
|
Final | 8/23/2013 | 8/23/2013 | 8/23/2013 | P | PART |
Bob Reichert
|
|
|
Treon Phone #: ###-#### ok final wash and lube bays
|
Final | 8/15/2013 | 8/15/2013 | 8/15/2013 | P | PART |
Daryl DeGrange
|
|
|
partial final//Treon Phone #: ###-#### lube shop apartial final
|
Permanent Service | 8/14/2013 | 8/14/2013 | 8/14/2013 | P | PASS |
Daryl DeGrange
|
|
|
treon Phone #: ###-#### p/s u/g n ok
|
Electrical Rough-In | 6/25/2013 | 6/26/2013 | 6/26/2013 | A | PASS |
Daryl DeGrange
|
|
|
underground inspection please-Treon-PLease call at least 30 mins prior for access Phone #: ###-#### rough-in ok cover underground between transformer and block wall
|
Electrical Rough-In | 4/18/2013 | 4/19/2013 | 4/19/2013 | P | PASS |
Doug A Poedy
|
|
|
TREON PLEASE CALL 15 MIN BEFORE GOING OUT Phone #: ###-####. Underground 2 1/2 inch pipes ok.
|
Electrical Rough-In | 4/3/2013 | 4/4/2013 | 4/4/2013 | A | PASS |
Daryl DeGrange
|
|
|
Need ufer ground inspection. Field Super Treon McCormack ###-#### Phone #: ###-#### >> Inspection requested via web by Kevin Perez rough-in ok cover concrete encased electrode
|