ELE-Aging Inspection | 5/12/2015 | 5/12/2015 | 5/13/2015 | | DONE |
Daryl DeGrange
|
|
|
see final ok
|
Final | 5/13/2015 | 5/13/2015 | 5/13/2015 | A | PASS |
Daryl DeGrange
|
|
|
Job complete, final ok
|
Electrical Rough-In | 5/31/2013 | 5/31/2013 | 5/31/2013 | P | PASS |
Rock A. Hudson
|
|
|
Inspection for bathroom on main level please give me half an hour notice to insure that someone is home thanks shaun ###-#### Phone #: ###-#### >> Inspection requested via web by Shaun Kirkman Bathroom remodel rough in ok cover
|
Permanent Service | 5/20/2013 | 5/20/2013 | 5/20/2013 | P | PASS |
Bob Reichert
|
|
|
Phone #: ###-#### >> Inspection requested via web by Shaun Kirkman p/s u/g rec ok
|
Electrical Rough-In | 4/22/2013 | 4/22/2013 | 4/22/2013 | P | PASS |
Rock A. Hudson
|
|
|
Please call to insure access thanks Shaun ###-####4 Phone #: ###-#### >> Inspection requested via web by Shaun Kirkman Kitchen remodel rough in ok cover
|
Conference | 4/19/2013 | 4/19/2013 | 4/19/2013 | P | DONE |
Rock A. Hudson
|
|
|
Phone #: ###-#### >> Inspection requested via web by Shaun Kirkman Discussed knob and tube wiring that passes through kitchen remodel area. Contractor concerns with metal ducting and plumbing and electrical piping in contact with existing knob and tube wiring. NEC 398.19 states there shall be a minimum of 2" of clearance from raceways, piping and other conducting material.
|