Final | 5/10/2013 | 5/10/2013 | 5/10/2013 | P | PASS |
Rock A. Hudson
|
|
|
Joe Phone #: ###-#### Corrections done Final ok
|
Permanent Service | 4/29/2013 | 4/29/2013 | 4/29/2013 | P | FAIL |
Daryl DeGrange
|
|
|
call 15 min prior//Joe Lothrup Phone #: ###-#### Sub-panel requires fourth conductor grounded conductor (green #6) panel blank or breaker, bond 4/11 j-box for hot tub circuit ,GFCI protection for hot tub
|
Electrical Rough-In | 4/25/2013 | 4/25/2013 | 4/25/2013 | P | DONE |
Rock A. Hudson
|
|
|
joseph Phone #: ###-#### Conference- Discussed code requirements for service change and hot tub grounding, receptical, light fixture clearences. service entrance, slip joint, #4 to concrete encased
|